All the Projects below were photographed before and after completion of the work. Some of them were taken before floor coverings, paint, decorating and accessories were applied but we feel that adds to their authenticity. Please view them left to right for best interpretation of what was achieved. Want yours HERE?
p
Page 1  Page 2  Page 3 Page 4  Page 5  Page 6
p
Project Type Bathroom Installation Project Notes:

Contemparary design

Location Delph Fitted in what was a bedroom, the room was re-plaster boarded and the floor was plylined. The new suite was a cubic design. A new half wall was built to hide pipes and provide shelving. 
Date 2008
Customer ML
p
Before Photo's After Photo's
29.jpg (18826 bytes) 30.jpg (14950 bytes)
31.jpg (19878 bytes) 32.jpg (18702 bytes)
33.jpg (22302 bytes) 34.jpg (15105 bytes)
35.jpg (20715 bytes) 36.jpg (19561 bytes)
37.jpg (13129 bytes) 38.jpg (16530 bytes)
39.jpg (13079 bytes) 40.jpg (13262 bytes)
41.jpg (8223 bytes) 42.jpg (21552 bytes)